Archives


Hot adding or removing a Cisco 3750 from a stack

When using a Cisco 3750 stack connected through stackwise technology you can add or remove a Cisco switch while the stack stays on. If you are adding or removing a switch from the stack, it is very important that the switch is turned OFF. The rest of the stack can keep doing its business.

For adding a switch to the stack follow these steps:

Step 1) On the new switch give the global command: switch stack-member-number provision type

Type is the type of switch you are adding to the stack.

When adding for example a third Cisco switch to the Cisco stack, use the following command:

switch 3 provision ws3750g-24t

Step 2) Power off the new stack member

Step 3) Connect the new member to the Cisco stack using the stacking cables, 1 loop at a time.

Step 4) Power on the new stack member. The switch will come alive and will receive the Cisco IOS version from the master, when that is completed it will be ready to service network requests.

For removing a member switch from the stack use the following steps:

Step 1) Power off the stack member to be removed.

Step 2) Remove the stackwise cable from the switch.

Step 3) Issue the following command on the stack master: no switch stack-member-number provision type


Background

Cisco StackWise technology is a stacking architecture optimized for Gigabit Ethernet with 32-Gbps interconnect throughput. Cisco StackWise technology unites up to nine individual Cisco Catalyst 3750 switches into a single logical unit, using special stack interconnect cables and stacking software. The stack behaves as a single switching unit that is managed by a master switch elected from one of the member switches. The master switch automatically creates and updates all the switching and optional routing tables. A working stack can accept new members or delete old ones without service interruption.

Google BookmarksEmailHyvesStumbleUponLinkedInShare

Related posts:

  1. Deciphering the Cisco 3750 product code
  2. Cisco Nexus 1000V released
  3. Want to know more about the Cisco Nexus 1000V?
  4. VMworld Europe 2009 – Cisco Nexus 1000v hands-on lab
  5. Cisco & VMware join forces: Cisco Unified Computing System

Tags:

About

Edwin Weijdema works as an Enterprise Architect at Imtech ICT in the Netherlands. His job is to build bridges between management and the technicians and vice verse. He has many different roles including working as a speaker, trainer, writer, pre-sales consultant, enterprise architect as well as providing risk analysis and responding to concerns and questions posed by his clients. In 2010 and 2011 VMware awarded him the VMware vExpert award for blogging and community efforts. In his spare time he likes to relax in a good online game with friends.